forum.iacs.org.uk

IACS forum
It is currently Tue Oct 17, 2017 6:09 am

All times are UTC


 
 Forum   Topics   Posts   Last post 
Forum locked Task 57 (PSU8001) - UR G3 Liquefied gas cargo and process piping

Consider amending UR G 3 Liquefied gas cargo and process piping to reflect the common survey practices of the Members on testing of cryogenic valves and adding in test requirements for valves intended to be used at a working temperature not lower than -55°C and for new LNG and LPG pumps.

0

0

No posts

No unread posts Task 65 (PSU9004) - Amendments to IACS Recommendation 72

To develop amendments to IACS Recommendation 72 with reflecting amendments to IMO Res. 864(20) to be addressed in MSC 87 and problems suffered by surveyors when inspecting heavy fuel oil tanks.

0

0

No posts

No unread posts Task 76 (PSU10038) - Extreme Emergency Circumstance

To discuss and revise IACS UR Z13 in order to eliminate the reference to ‘extreme’ from the phrase ‘extreme emergency circumstance’, thereby avoiding the definition of an extreme emergency, and bringing the document closer into line with MSC/Circ. 1070

0

0

No posts

No unread posts Task 57 (PSU8001) - UR G3 Liquefied gas cargo and process piping

Consider amending UR G 3 Liquefied gas cargo and process piping to reflect the common survey practices of the Members on testing of cryogenic valves and adding in test requirements for valves intended to be used at a working temperature not lower than -55°C and for new LNG and LPG pumps.

0

0

No posts

No unread posts Task 65 (PSU9004) - Amendments to IACS Recommendation 72

To develop amendments to IACS Recommendation 72 with reflecting amendments to IMO Res. 864(20) to be addressed in MSC 87 and problems suffered by surveyors when inspecting heavy fuel oil tanks.

0

0

No posts

No unread posts Task 1 (PSU9041) - UR Z10s CSR harmonization

Basing on that fact that bulkcarriers and oil tankers have transverse framing system applied for examples on ship’s sides etc. and that URZ7 is applied to all types of ships and include extended definition of transverse section it is necessary to unify this definition in URZ10s.

0

0

No posts

No unread posts Task 1 (PSU10018) - Meaning of pitting (Rec. 12 & 47)

To revise the Recommendation 47, Par.4.2.1 and 4.2.2 with the aim to eliminate uncertainties related to determining the imperfection surface area ratio and subsequently the acceptance criteria for minor imperfections which do not need to be repaired.

0

0

No posts

No unread posts Task 1 (PSU10025) - small corrections to UR Z10.2 and other UR Z10s

Update the references in the executive hull summary table IX of UR Z10s

0

0

No posts

No unread posts Task 1 (PSU10027) - UR Z10s CSR harmonization

Update Rec. 47 on typical butt weld plate edge preparation repair and clarify the term, ‘standard’ range and ‘limit’ range having been used in Rec. 47

0

0

No posts

No unread posts Task 53

- Amendment of UISC191

- Portable ladder & Cherry Picker (from Task 72/PSU9022)

0

0

No posts

No unread posts Task 70 (PSU9019) - Class conditions of class (recommendations) and the affect on Statutory certificates

To revise IACS Recommendation 98 concerning procedural manners of issueing or withdrawing full & short term statutory certificates under the conditions of various deficiencies in items related to the international conventions to adjust them in accordance with today's implemented practice among class societies.

0

0

No posts

No unread posts Task 71 (PSU9044) - TOCA - VESSEL'S HISTORY REPORT

- To amend PR 1A to introduce the requirement fro the losing society to provide the gaining society with:

a) the standard structural diminution allowances within two working days

b) the UR S19/31 assessment reports within one week of the receipt of the request for transfer of class.

2

2

Thu Sep 09, 2010 12:23 am

kyheo@krs.co.kr View the latest post

No unread posts Task 72 (PSU9022) - Alternative means of access/SOLAS II-1/3-6/wire lift platform

To discuss about the use of Wire Lift Platform at the field, especially from the viewpoint of safety, and develop a safety standard for a new guidelines or wording for relevant IACS resolutions concerning with the use of Wire Lift Platform

0

0

No posts

No unread posts Task 73 / PSU10010 - PR11 - definition of ‘major portion of the ship’ to be indicated after modification

To clarify the definition of a 'major portion' of the ship and review relevant parts of PRs to find out any necessity of amendment.

0

0

No posts

No unread posts Miscellaneous

12

12

Fri Oct 25, 2013 9:50 am

ch-nksurp@classnk.or.jp View the latest post

No unread posts Task 74 (PSU10036) - UR Z16 amendment to exclude LNG Type A tanks from the application of Non-Destructive testing

To exclude LNG type A tanks from the application of Non-destructive testing in UR Z16

0

0

No posts

No unread posts Task 75 (PSU10031) - Interpretation of IMO Res. A.997 - Scope for Intermediate Safety Construction Survey

To develop classification requirements in UR Z7 for the intermediate survey of cargo spaces of ships over 10 years of age, for ships other than ships engaged in the carriage of dry cargoes only or ships subject to Z10.1, Z10.3, Z10.4 or Z7.2.

0

0

No posts

No unread posts Task 77 (PSU9014) - pressure testing of cargo tanks for oil & chemical tankers

To revise the requirements for pressure testing of cargo tank bulkheads which are not adjacent to non-cargo tanks/space for oil tankers at class renewal survey in UR Z10.1 and Z10.4 in order to accept Master’s statement, that the pressure testing has been carried out according to requirements.

0

0

No posts




You do not have the required permissions to read topics within this forum.


Login

Username:   Password:   Log me on automatically each visit  


All times are UTC


Who is online

Users browsing this forum: No registered users and 1 guest


Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group