forum.iacs.org.uk

IACS forum
It is currently Tue Mar 19, 2019 10:57 am

All times are UTC [ DST ]


 
 Forum   Topics   Posts   Last post 
Forum locked Task 57 (PSU8001) - UR G3 Liquefied gas cargo and process piping

Consider amending UR G 3 Liquefied gas cargo and process piping to reflect the common survey practices of the Members on testing of cryogenic valves and adding in test requirements for valves intended to be used at a working temperature not lower than -55°C and for new LNG and LPG pumps.

0

0

No posts

No unread posts Task 65 (PSU9004) - Amendments to IACS Recommendation 72

To develop amendments to IACS Recommendation 72 with reflecting amendments to IMO Res. 864(20) to be addressed in MSC 87 and problems suffered by surveyors when inspecting heavy fuel oil tanks.

0

0

No posts

No unread posts Task 76 (PSU10038) - Extreme Emergency Circumstance

To discuss and revise IACS UR Z13 in order to eliminate the reference to ‘extreme’ from the phrase ‘extreme emergency circumstance’, thereby avoiding the definition of an extreme emergency, and bringing the document closer into line with MSC/Circ. 1070

0

0

No posts

No unread posts Task 57 (PSU8001) - UR G3 Liquefied gas cargo and process piping

Consider amending UR G 3 Liquefied gas cargo and process piping to reflect the common survey practices of the Members on testing of cryogenic valves and adding in test requirements for valves intended to be used at a working temperature not lower than -55°C and for new LNG and LPG pumps.

0

0

No posts

No unread posts Task 65 (PSU9004) - Amendments to IACS Recommendation 72

To develop amendments to IACS Recommendation 72 with reflecting amendments to IMO Res. 864(20) to be addressed in MSC 87 and problems suffered by surveyors when inspecting heavy fuel oil tanks.

0

0

No posts

No unread posts Task 1 (PSU9041) - UR Z10s CSR harmonization

Basing on that fact that bulkcarriers and oil tankers have transverse framing system applied for examples on ship’s sides etc. and that URZ7 is applied to all types of ships and include extended definition of transverse section it is necessary to unify this definition in URZ10s.

0

0

No posts

No unread posts Task 1 (PSU10018) - Meaning of pitting (Rec. 12 & 47)

To revise the Recommendation 47, Par.4.2.1 and 4.2.2 with the aim to eliminate uncertainties related to determining the imperfection surface area ratio and subsequently the acceptance criteria for minor imperfections which do not need to be repaired.

0

0

No posts

No unread posts Task 1 (PSU10025) - small corrections to UR Z10.2 and other UR Z10s

Update the references in the executive hull summary table IX of UR Z10s

0

0

No posts

No unread posts Task 1 (PSU10027) - UR Z10s CSR harmonization

Update Rec. 47 on typical butt weld plate edge preparation repair and clarify the term, ‘standard’ range and ‘limit’ range having been used in Rec. 47

0

0

No posts

No unread posts Task 53

- Amendment of UISC191

- Portable ladder & Cherry Picker (from Task 72/PSU9022)

0

0

No posts

No unread posts Task 70 (PSU9019) - Class conditions of class (recommendations) and the affect on Statutory certificates

To revise IACS Recommendation 98 concerning procedural manners of issueing or withdrawing full & short term statutory certificates under the conditions of various deficiencies in items related to the international conventions to adjust them in accordance with today's implemented practice among class societies.

0

0

No posts

No unread posts Task 71 (PSU9044) - TOCA - VESSEL'S HISTORY REPORT

- To amend PR 1A to introduce the requirement fro the losing society to provide the gaining society with:

a) the standard structural diminution allowances within two working days

b) the UR S19/31 assessment reports within one week of the receipt of the request for transfer of class.

2

2

Thu Sep 09, 2010 1:23 am

kyheo@krs.co.kr View the latest post

No unread posts Task 72 (PSU9022) - Alternative means of access/SOLAS II-1/3-6/wire lift platform

To discuss about the use of Wire Lift Platform at the field, especially from the viewpoint of safety, and develop a safety standard for a new guidelines or wording for relevant IACS resolutions concerning with the use of Wire Lift Platform

0

0

No posts

No unread posts Task 73 / PSU10010 - PR11 - definition of ‘major portion of the ship’ to be indicated after modification

To clarify the definition of a 'major portion' of the ship and review relevant parts of PRs to find out any necessity of amendment.

0

0

No posts

No unread posts Miscellaneous

12

12

Fri Oct 25, 2013 10:50 am

ch-nksurp@classnk.or.jp View the latest post

No unread posts Task 74 (PSU10036) - UR Z16 amendment to exclude LNG Type A tanks from the application of Non-Destructive testing

To exclude LNG type A tanks from the application of Non-destructive testing in UR Z16

0

0

No posts

No unread posts Task 75 (PSU10031) - Interpretation of IMO Res. A.997 - Scope for Intermediate Safety Construction Survey

To develop classification requirements in UR Z7 for the intermediate survey of cargo spaces of ships over 10 years of age, for ships other than ships engaged in the carriage of dry cargoes only or ships subject to Z10.1, Z10.3, Z10.4 or Z7.2.

0

0

No posts

No unread posts Task 77 (PSU9014) - pressure testing of cargo tanks for oil & chemical tankers

To revise the requirements for pressure testing of cargo tank bulkheads which are not adjacent to non-cargo tanks/space for oil tankers at class renewal survey in UR Z10.1 and Z10.4 in order to accept Master’s statement, that the pressure testing has been carried out according to requirements.

0

0

No posts

No unread posts Task 1 (PSU9035) - UR Z21 Amendments

It was an agenda for the purpose of eliminating reservations for UR Z 21 regarding surveys of propeller shafts and tube shafts, which has been in stalemate for several years of long discussion. At the last Survey Panel spring meeting (4 - 5 Mar. 2009) the Panel reached an agreement to deal with it from the beginning and the necessity to transform the reservations of UR Z 21 into Recommendations was raised. However, a member society proposed that the basic requirements, for which Members have not raised any reservation, could remain in a short UR, while the rest could be included in a Recommendation. So, all panel members agreed with the idea, which categorize UR Z 21 into basic requirements to be remained in UR Z21 and the remainder to be transformed into a Recommendation.

0

0

No posts

No unread posts PSU14036 - Secondary Barrier test - Revision of the drafted text of Item GA 2.1.2.10 of Imo Resolustion A.1053(27)as amended.

According the outcomes of the IMO III Subcommittee the item GI 2.1.2.10 has been agreed to be modified according to IACS submission (III 1/10/03). The new text of Item GI 2.1.2.10 does not recall word by word the provisions contained in IACS UI GC 12 (rev.1). Moreover a slightly different text (from those approved by III Subcommittee) is used in IACS UR Z16.
Panel is require to verify if a re-alignment is necessary.
Moreover Panel is required to evaluate whether the item GR 2.4.2.2, of IMO Res. A.1053(27) as amended, should be updated according the provisions of UI GC 12 (rev.1) for glued secondary barriers

1

1

Thu Oct 02, 2014 3:20 pm

gianluca.mantegazza@rina.org View the latest post

No unread posts PSU15009 - Develop survey requirements for gas fuelled ships

This task is to develop a Unified Requirement for the survey of ships using gases or other low-flashpoint fuels prior to the implementation of the IGF Code.

0

0

No posts

No unread posts Task PSU17001 - To revise PR5 in light of the requirements of IMO RO Code and Regulation (EC) NO 391/2009, Annex B.1 concerning the use of surveyors in exceptional and duly justified cases where a RO’s own exclusive surveyor is not available.

The objective of this task is to revise IACS Procedure Requirement PR5, as necessary under the connection with IMO RO Code and EC regulation.

0

0

No posts




You do not have the required permissions to read topics within this forum.


Login

Username:   Password:   Log me on automatically each visit  


All times are UTC [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group