No unread posts Task 2

Annual Review of Implementation of IACS Resolutions

4

32

Wed Jul 06, 2011 8:12 pm

amalarkey@eagle.org View the latest post

No unread posts Task 16

Scope of application of UR S30 within the definition of ‘bulk carrier’

1

1

Mon Nov 09, 2009 11:14 pm

Hull.Panel_SEC View the latest post

No unread posts Task 18

Requirements for Ro-Ro side opening (clamshell) bow doors

1

1

Mon Nov 09, 2009 11:15 pm

Hull.Panel_SEC View the latest post

No unread posts Task 35

Crosscheck of the CSR FEA requirements (CSR PT3)

1

1

Thu Jul 14, 2011 10:09 pm

amalarkey@eagle.org View the latest post

No unread posts Miscellaneous

Archived from the Miscellaneous Forum.

17

80

Fri May 16, 2014 3:31 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 50 - Maintain consistency between the UR S and the CSR for bulk carriers and CSR for oil tankers

Identify and eliminate any conflicts in the requirements between UR S and CSR for Bulk Carriers and CSR for Oil Tankers.

3

8

Tue Mar 27, 2012 4:45 pm

amalarkey@eagle.org View the latest post

No unread posts Task 06 - Maintenance of CSRs for oil tanker rules

Maintain the CSR for oil tankers with a view to updating the rules through feedback based on application.

12

63

Tue Oct 30, 2012 7:35 pm

amalarkey@eagle.org View the latest post

No unread posts Task 59 - Corrosion Resistant Steel

Develop either a UR or UI for the approval, manufacture and certification of Corrosion Resistance Steels and through this provide guidance to the industry on the material and its correct application.

1

6

Wed Mar 20, 2013 7:52 pm

amalarkey@eagle.org View the latest post

No unread posts Task 63 - UR S27 application to RoRo ships with large hold ventilators

PH11039_ - UR S27 application to RoRo ships with large hold ventilators: Proposed task within the Hull Panel.

1

8

Thu Jul 18, 2013 8:04 pm

amalarkey@eagle.org View the latest post

No unread posts Task 05 - Maintenance of CSRs for bulk carriers rules

Maintain the CSR for bulk carriers with a view to updating the rules through feedback based on application.

10

46

Mon Nov 18, 2013 2:41 pm

amalarkey@eagle.org View the latest post

No unread posts CSR Harmonization

24

58

Fri Mar 21, 2014 11:41 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 49 - Revision of UR I2 (Structural Requirements for Polar Class Ships)

To develop amendments to improve UR I2, in order to expand the scope of the existing requirements and to improve the consistency and physical basis of the formulations.

2

9

Fri Mar 21, 2014 11:56 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 52 - Review the use of extremely thick steel plate in light of recent research findings

Review the existing rule application for the use of extremely thick steel plates, such as the toughness against brittle fracture, fatigue and general design aspects. Prepare any necessary rule updates for the use of extremely thick steel plates in combination with high tensile steels up to yield strength of 460 N/mm².

PT52 is to be re-started in order to deal with the revision of UR S33

2

0

Thu Oct 02, 2014 9:51 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 54 - Review of IACS Recommendation No.10, A2 and A1

Review recent safety digest and industry guidelines and propose any necessary revisions of IACS Recommendation No.10, A2 and A1.

2

13

Thu Oct 02, 2014 9:55 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 56 - Review and update UR S11 on vessel longitudinal strength

Review the recommendations made in the MAIB report on the "MSC Napoli", and prepare a response or propose any necessary revisions to the UR S requirements.

The scope of this task has been extended following the "Mol Comfort" to "Improve Hull Girder Strength Standard".

2

6

Wed Mar 05, 2014 3:44 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 58 - Re-evaluate the material factor for HT40 steel contained in UR S4

Review the material factor for HT40 steel contained in UR S4 to unify, and propose any necessary revision to UR S4.

2

19

Wed Aug 13, 2014 11:53 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 62 - UR S10 Rudder Update

PH11031_ - UR S10 Rudder Update: Proposed PT to complete the revision of UR S10, which was started in PH6024_ and PH10011_

2

10

Tue Apr 28, 2015 1:32 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task PT PH31 Review and further development of UR S21A

Study the differences between UR S21A and other related IACS documents, such as UR S21, CSR, etc. All problems and inconsistencies are to be identified and industry feedback is to be considered.

(Previously under Old Task 14 - Develop a new Unified Requirement for hatch covers of ships other than bulk carriers, ore carriers and combination carriers as defined in UR Z11: Develop Requirements for the evaluation of scantlings of hatch covers and hatch coamings of cargo holds of ships other than bulk carriers, ore carriers and combination carriers.)

1

10

Tue Apr 28, 2015 1:41 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task PT PH33 - FE Load Case Definition for Container Ships

A systematic review of loading conditions for the cargo hold region will be carried out to develop a more uniform application of FE procedures ensuring that both a required extent and depth of analysis is carreid out by all Member Societies.

1

3

Tue Apr 28, 2015 1:39 pm

elizabeth.mccraig@lr.org View the latest post




You do not have the required permissions to read topics within this forum.


Login

Username:   Password:   Log me on automatically each visit  


All times are UTC [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group