forum.iacs.org.uk

IACS forum
It is currently Wed Jul 17, 2019 12:15 pm

All times are UTC [ DST ]


 
 Forum   Topics   Posts   Last post 
No unread posts Task PT PSU32 (PSU16049) - Develop survey requirements for inspection/survey, installation, tracking, and maintenance of multi-cable transit systems

Development of a new Unified Requirement or a new Recommendation for the inspection/survey of ships using Multi Cable Transits (MCTs) in way of watertight and fire tight rated bulkheads and decks that will be universally applied by all members. Evaluate whether the inspection activities would need the support of a certified service supplier and consequently develop the criteria for its certification to be included in a revision of UR Z17.

0

0

No posts

No unread posts Task PT PSU35 (PSU16053) - Develop survey requirements at first loading/unloading for liquefied gas carriers not covered by UI GC13.

Review UI GC 13 for LNG Carriers and consider whether to revise it or develop a new UI for liquefied gas carriers not covered by UI GC13. The UI should consider the following paragraphs of the 2016 IGC Code (IMO Res. MSC 370(93)): 4.20.3.5 -4.20.3.7, 5.13.2.5, 13.3.5, 13.7.2.4 and 13.9.7 when developing the requirements.

0

0

No posts

No unread posts Task Panel PT PSU34 (PSU16057) – Future work directions on the implications of new technology on survey regime

To review and set the future work directions on the implications of new technology on survey regime which includes CBM (Condition Based Monitoring and inspection methods) and RMD (Remote Monitoring and Diagnosis). Development of new IACS tools (Guidelines/Recommendations).

0

0

No posts




You do not have the required permissions to read topics within this forum.


Login

Username:   Password:   Log me on automatically each visit  


All times are UTC [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group