forum.iacs.org.uk

IACS forum
It is currently Tue Oct 17, 2017 6:08 am

All times are UTC


 
 Forum   Topics   Posts   Last post 
No unread posts Task 49 - Revision of UR I2 (Structural Requirements for Polar Class Ships)

To develop amendments to improve UR I2, in order to expand the scope of the existing requirements and to improve the consistency and physical basis of the formulations.

2

9

Fri Mar 21, 2014 10:56 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 52 - Review the use of extremely thick steel plate in light of recent research findings

Review the existing rule application for the use of extremely thick steel plates, such as the toughness against brittle fracture, fatigue and general design aspects. Prepare any necessary rule updates for the use of extremely thick steel plates in combination with high tensile steels up to yield strength of 460 N/mm².

PT52 is to be re-started in order to deal with the revision of UR S33

2

12

Thu Oct 02, 2014 8:51 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 54 - Review of IACS Recommendation No.10, A2 and A1

Review recent safety digest and industry guidelines and propose any necessary revisions of IACS Recommendation No.10, A2 and A1.

2

13

Thu Oct 02, 2014 8:55 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 56 - Review and update UR S11 on vessel longitudinal strength

Review the recommendations made in the MAIB report on the "MSC Napoli", and prepare a response or propose any necessary revisions to the UR S requirements.

The scope of this task has been extended following the "Mol Comfort" to "Improve Hull Girder Strength Standard".

2

6

Wed Mar 05, 2014 2:44 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 58 - Re-evaluate the material factor for HT40 steel contained in UR S4

Review the material factor for HT40 steel contained in UR S4 to unify, and propose any necessary revision to UR S4.

2

19

Wed Aug 13, 2014 10:53 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 61 - Development of Ice Certificate for Polar Code and update of UR S6 following adoption of Polar Code

PH11022_ - Development of Ice Certificate for Polar Code: Proposed PT to work on Observer's Report Recommendation from DE55 Agenda Item 12 “Development of a mandatory Code for ships operating in polar climates” and further develop the content of a draft ice certificate (ice operations manual). This PT was commenced in 2014 with an aim to develop guidance on the application and implementation of the Polar Code. The target completion date for overall work is by the end of Q1 2016.

1

9

Thu Oct 02, 2014 9:02 am

elizabeth.mccraig@lr.org View the latest post

No unread posts Task 62 - UR S10 Rudder Update

PH11031_ - UR S10 Rudder Update: Proposed PT to complete the revision of UR S10, which was started in PH6024_ and PH10011_

2

10

Tue Apr 28, 2015 12:32 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task PT PH31 Review and further development of UR S21A

Study the differences between UR S21A and other related IACS documents, such as UR S21, CSR, etc. All problems and inconsistencies are to be identified and industry feedback is to be considered.

(Previously under Old Task 14 - Develop a new Unified Requirement for hatch covers of ships other than bulk carriers, ore carriers and combination carriers as defined in UR Z11: Develop Requirements for the evaluation of scantlings of hatch covers and hatch coamings of cargo holds of ships other than bulk carriers, ore carriers and combination carriers.)

1

10

Tue Apr 28, 2015 12:41 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task PT PH32 - CSR Maintenance Team

The Hull Panel has identified the need for one “CSR maintenance team” to manage the IACS CSR after the harmonization of the individual CSR-OT and CSR-BC. This maintenance team is needed to make proposals to answer Knowledge Centre Questions and Rule Changes for the Hull Panel to consider.

2

2

Wed Aug 13, 2014 12:52 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task PT PH33 - FE Load Case Definition for Container Ships

A systematic review of loading conditions for the cargo hold region will be carried out to develop a more uniform application of FE procedures ensuring that both a required extent and depth of analysis is carreid out by all Member Societies.

1

3

Tue Apr 28, 2015 12:39 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Miscellaneous

For items discussed within the Hull Panel that may result in the creation or modification of a UI, UR, or PR but are not part of a Task Number or Project Team.

4

25

Tue Apr 28, 2015 12:34 pm

elizabeth.mccraig@lr.org View the latest post

No unread posts Task PT PH39 Investigate requirements for coatings in cargo holds of bulk carriers

This task is to establish whether a coating standard and/or a UR would be required for coatings in the cargo holds of the bulk carriers.

Note: need for development of a UR depends on the outcome of discussions with the stakeholders in the industry and hence will be decided at a later date.

0

0

No posts




You do not have the required permissions to read topics within this forum.


Login

Username:   Password:   Log me on automatically each visit  


All times are UTC


Who is online

Users browsing this forum: No registered users and 1 guest


Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group